PUPTECK Outdoor Dog Run Cable for Small to Large Dogs up to 125lbs, Heavy Duty Tie Out Cable Trolley System with Runner Pulley Cable Zip Line for Yard, Camping, Long Lead Chain Leash
$23.99






Price: $29.99 - $23.99
(as of Aug 30, 2025 08:23:31 UTC – Details)
Product description


Every dog loves to run around, but you always worry about your pet will bolt into the woods or street.
So why not have a try on this amazing Dog Run Cable, it will gives her/him a ton of area to run wildly without any worry.

Slides smoothly across the tie out cable without getting stuck, following your dog as he explores.

Reducing tension and absorbing the shock of quick movement to a greater extent when tugging

Easy to attach to a dog collar or harness, tangle free without tangling and rust-proof.

Made by high quality and durable rust-resistant material, durable and strong enough to stand up to constant activity.

This runner is sturdy with how well its holding up to every dog constant running and pulling when she tries to go further than it allows her.

INSTALLATION INSTRUCTION
1 Installation height should be 7-8 inches or higher above the ground. 2 Screw the hooks into stationary objects. 3 Attach the shock absorber spring end of the trolley to one of the hooks. 4 Slide one of the protective stoppers onto the cable and let it slide loosely. 5 Slide the pulley onto the cable. 6 Slide the second protective stoppers onto the cable and let it slide loosely. 7 Loop the end of the cable tight, secure the large clamp. Tighten the clamps. 8 Any excess cable can be cut off. 9 Select the optional location for the stops. Place a small clamp behind each stop. 10 Attach one end of the lead line to the pulley and the other end to the dog’s collar. Your dog will now enjoy the freedom of the PUPTECK Reflective Dog Run Cable, run happily outside! NOTICE 1 Ensure installation is secure, check the condition of your dog’s collar for any weak spots that could tear. It is not advisable to use worn-out collars with this product. NOTICE 2 It is for dog up to 125 lbs. Aggressive or vicious dogs should not be left unsupervised. Inspect all parts periodically for excessive or damage. Do not allow cable to become kinked. NOTICE 3 Dog trolley system should be installed high enough above ground so that people will not walk into cable. SERVICE *If you have any questions after receiving the product, please do not worry. Leave us a message and we will reply to you within 24 hours, providing you with satisfactory solutions.
PUPTECK Dog Runner for Yard
Product Include
40ft Dog Tie Out Cable & 16″ Stake
Product Include
Dog Run Cable – 100 ft Heavy Duty Tie Out Cable with 10 Ft Runner
Product Include
Dog Run Cable – 100 ft Heavy Duty Tie Out Cable with 10 Ft Runner
Durable and Rust-proof
Rain and rust resistant, can be used in rain, sun, snow and wind.
Suitable for Multi place
In the Park/In the Yard/Camping.
Let your dog roam outside
Connact with dog collar or harness, we offer multi collars and harness in shop.
Date First Available : February 20, 2019
Manufacturer : beibao
ASIN : B07P33H35N
Best Sellers Rank: #60,767 in Pet Supplies (See Top 100 in Pet Supplies) #191 in Dog Tie-Outs & Stakes
Customer Reviews: 4.3 4.3 out of 5 stars 1,997 ratings var dpAcrHasRegisteredArcLinkClickAction; P.when(‘A’, ‘ready’).execute(function(A) { if (dpAcrHasRegisteredArcLinkClickAction !== true) { dpAcrHasRegisteredArcLinkClickAction = true; A.declarative( ‘acrLink-click-metrics’, ‘click’, { “allowLinkDefault”: true }, function (event) { if (window.ue) { ue.count(“acrLinkClickCount”, (ue.count(“acrLinkClickCount”) || 0) + 1); } } ); } }); P.when(‘A’, ‘cf’).execute(function(A) { A.declarative(‘acrStarsLink-click-metrics’, ‘click’, { “allowLinkDefault” : true }, function(event){ if(window.ue) { ue.count(“acrStarsLinkWithPopoverClickCount”, (ue.count(“acrStarsLinkWithPopoverClickCount”) || 0) + 1); } }); });
HAPPY RUNNING TROLLEY SYSTEM: Equipped with a 100ft dog tie-out cable and a 10ft runner cable, which gives your dog freedom and mobility. Both are steel durable cable with vinyl-coated to protect against corrosion, help the pulley run smoothly along the cable, durable and long-lasting for dogs running crazy whether used in rain, sun, snow, or wind weather
SUPER LONG, STRONG ENOUGH: This tie-out cable for dogs is strength tested for Dogs up to 125 pounds. 100 ft tie-out cable designed especially to give more space for large dogs to move around freely. Your puppy will promote healthy exercise without feeling a sense of nooses because the lead is like an invisible fence and makes your dog feel less strained
SHOCK-ABSORBING BUFFER SPRING: Our dog trolley system’s spring is located on the 100ft Cable, reducing tension and absorbing the shock of quick movement to a greater extent when tugging, releasing the impact force to the outside, keeping your puppy feel ease and secure while reducing the frequent pulling and wear of the rope and increasing its service life
NO TANGLE, KEEP SAFE: Compared to a typical dog tie-out, the Trolley System with 360° tangle swivel can effectively avoid the bushes or other obstacles on the ground, let your dog run safely without tangle. The silver reflective design can even provide visibility protection at night. Let you quickly confirm the dog’s position. Free your hand, without the fear of them running off when camping
EASY TO INSTALL: Our dog trolley system comes with all components needed for easy set up with detailed Installation Instructions, if you have any concerns or dissatisfaction for any reason just feel free to contact us, and we will help you to solve your problem within 24 hours
User Reviews
Be the first to review “PUPTECK Outdoor Dog Run Cable for Small to Large Dogs up to 125lbs, Heavy Duty Tie Out Cable Trolley System with Runner Pulley Cable Zip Line for Yard, Camping, Long Lead Chain Leash”
$23.99

There are no reviews yet.